RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2317025554 - Archived data from Tue, 11. August 2020 17:41:50 CEST


This is all the information about APD 2317025554. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2317025554
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 181
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.824862 V     T = -25 °C: 344.6073313 V
Voltage for Gain 150: T = +20 °C: 386.641096 V     T = -25 °C: 351.9013528 V
Voltage for Gain 200: T = +20 °C: 391.0014522 V     T = -25 °C: 356.224456 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.678523889 V-1     T = -25 °C: 4.545060732 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.304184031 V-1     T = -25 °C: 9.629928234 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.42802998 V-1     T = -25 °C: 14.7950876 V-1
Break-through voltage: T = +20 °C: 407.1917164 V     T = -25 °C: 370.4794508 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:47:35 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:18:18 CET jreher Updated box and position via API.
11. Aug 2020 17:41:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:47 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:53 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:03 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:14 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:16 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:20 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:16 CET jreher Updated APD location via API.
25. Nov 2019 17:28:58 CET jreher Updated box and position via API.
22. Oct 2019 13:08:16 CEST spankonin Updated APD location via API.
18. Oct 2019 14:12:38 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 12:00:10 CEST Tobias Imported from Hamamatsu datasheet.