RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2316025529 - Archived data from Tue, 11. August 2020 17:41:45 CEST


This is all the information about APD 2316025529. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2316025529
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2316025529/1913021304
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.9 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 225
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.9104503 V     T = -25 °C: 344.5005948 V
Voltage for Gain 150: T = +20 °C: 387.745735 V     T = -25 °C: 351.878612 V
Voltage for Gain 200: T = +20 °C: 392.1311622 V     T = -25 °C: 356.023358 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.630169585 V-1     T = -25 °C: 4.711021843 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.041026404 V-1     T = -25 °C: 9.485152833 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.94583662 V-1     T = -25 °C: 14.8812896 V-1
Break-through voltage: T = +20 °C: 408.1044306 V     T = -25 °C: 371.6271415 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:17:23 CET jreher Updated box and position via API.
11. Aug 2020 17:41:45 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:35 CEST jreher Updated box and position via API.
31. Mar 2020 08:52:19 CEST jreher Assigned to capsule by script
13. Feb 2020 13:37:23 CET jreher Updated box and position via API.
16. Jan 2020 12:05:51 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:02 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:12 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:13 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:18 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:08:53 CET jreher Updated APD location via API.
25. Nov 2019 17:28:27 CET jreher Updated box and position via API.
22. Oct 2019 12:57:28 CEST spankonin Updated APD location via API.
18. Oct 2019 14:11:38 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 12:00:09 CEST Tobias Imported from Hamamatsu datasheet.