RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2316025526 - Archived data from Tue, 11. August 2020 17:41:44 CEST


This is all the information about APD 2316025526. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2316025526
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2302024308/2316025526
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 225
Position in Box: 29
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.1296563 V     T = -25 °C: 347.5225364 V
Voltage for Gain 150: T = +20 °C: 390.9830115 V     T = -25 °C: 354.9391561 V
Voltage for Gain 200: T = +20 °C: 395.3676569 V     T = -25 °C: 359.0927034 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.572720101 V-1     T = -25 °C: 4.714985422 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.985413263 V-1     T = -25 °C: 9.501844455 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92174164 V-1     T = -25 °C: 15.062184 V-1
Break-through voltage: T = +20 °C: 409.877554 V     T = -25 °C: 373.6390332 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:17:23 CET jreher Updated box and position via API.
11. Aug 2020 17:41:44 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:35 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:12 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:11 CET jreher Updated box and position via API.
16. Jan 2020 12:05:51 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:01 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:12 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:13 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:18 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:08:53 CET jreher Updated APD location via API.
25. Nov 2019 17:28:26 CET jreher Updated box and position via API.
22. Oct 2019 12:57:28 CEST spankonin Updated APD location via API.
18. Oct 2019 14:11:38 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 12:00:09 CEST Tobias Imported from Hamamatsu datasheet.