RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2316025498 - Archived data from Fri, 05. February 2021 11:17:32 CET


This is all the information about APD 2316025498. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2316025498
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 22
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8471111 V     T = -25 °C: 347.8999215 V
Voltage for Gain 150: T = +20 °C: 390.6813239 V     T = -25 °C: 355.2590314 V
Voltage for Gain 200: T = +20 °C: 395.0387911 V     T = -25 °C: 359.4823568 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.644745076 V-1     T = -25 °C: 4.591710038 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.242082116 V-1     T = -25 °C: 8.785517409 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.46273069 V-1     T = -25 °C: 17.24009813 V-1
Break-through voltage: T = +20 °C: 411.0063188 V     T = -25 °C: 374.3600855 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:57 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:17:32 CET jreher Updated box and position via API.
11. Aug 2020 17:42:27 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:46 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:49 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:59 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:10 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:09 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:15 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:05 CET jreher Updated APD location via API.
25. Nov 2019 17:28:31 CET jreher Updated box and position via API.
22. Oct 2019 16:25:55 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:10:07 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:08 CEST Tobias Imported from Hamamatsu datasheet.