Show Hamamatsu Avalanche Photo Diode 2316025490 - Archived data from Wed, 07. October 2020 12:13:01 CEST
This is all the information about APD 2316025490. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2316025490 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | assigned to 2703030177/2316025490 |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | red |
Manufacturer information: | |
Wafer position: | C09 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 381.2 V |
Dark current: | 6.3 nA |
Screening Logistics: | |
Available: | No |
Storage Box: | 226 |
Position in Box: | 27 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 381.9507945 V T = -25 °C: 346.3175059 V |
Voltage for Gain 150: | T = +20 °C: 389.7738769 V T = -25 °C: 353.7057642 V |
Voltage for Gain 200: | T = +20 °C: 394.1323803 V T = -25 °C: 357.8241937 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.63176458 V-1 T = -25 °C: 4.802485149 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.191937571 V-1 T = -25 °C: 9.825784069 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.25773125 V-1 T = -25 °C: 15.69278383 V-1 |
Break-through voltage: | T = +20 °C: 408.9155249 V T = -25 °C: 372.5594506 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:17:31 CET | jreher | Updated box and position via API. |
07. Oct 2020 12:13:01 CEST | jreher | Assigned to capsule by script |
17. Aug 2020 15:53:27 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:42:25 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:28:45 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:05:48 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:03:59 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:09 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:08 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:15 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:09:04 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:28:31 CET | jreher | Updated box and position via API. |
22. Oct 2019 16:25:55 CEST | spankonin | Updated APD batch assignment via API. |
22. Oct 2019 16:10:07 CEST | spankonin | Updated APD location via API. |
23. Jun 2016 12:00:08 CEST | Tobias | Imported from Hamamatsu datasheet. |