RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2316025480 - Archived data from Thu, 16. January 2020 12:05:48 CET


This is all the information about APD 2316025480. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2316025480
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 226
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:05:23 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:36 CET jreher Updated box and position via API.
05. Feb 2021 11:17:30 CET jreher Updated box and position via API.
11. Aug 2020 17:42:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:44 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:48 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:58 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:08 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:07 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:14 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:03 CET jreher Updated APD location via API.
25. Nov 2019 17:28:30 CET jreher Updated box and position via API.
22. Oct 2019 16:25:25 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:10:06 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:08 CEST Tobias Imported from Hamamatsu datasheet.