RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2315025413 - Archived data from Tue, 11. August 2020 17:42:23 CEST


This is all the information about APD 2315025413. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2315025413
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2315025413/2311025082
Unit: #1152 (barcode 1309012879)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.3 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 226
Position in Box: 16
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1246162 V     T = -25 °C: 348.5092533 V
Voltage for Gain 150: T = +20 °C: 391.9694719 V     T = -25 °C: 355.9660391 V
Voltage for Gain 200: T = +20 °C: 396.3328744 V     T = -25 °C: 360.1458857 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.573707915 V-1     T = -25 °C: 4.671932487 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.045211432 V-1     T = -25 °C: 9.430684285 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.01722841 V-1     T = -25 °C: 14.8593843 V-1
Break-through voltage: T = +20 °C: 411.50984 V     T = -25 °C: 375.4442894 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:17:29 CET jreher Updated box and position via API.
11. Aug 2020 17:42:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:44 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:13 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:11 CET jreher Updated box and position via API.
16. Jan 2020 12:05:48 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:58 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:08 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:06 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:14 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:03 CET jreher Updated APD location via API.
25. Nov 2019 17:28:30 CET jreher Updated box and position via API.
22. Oct 2019 16:25:25 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:10:06 CEST spankonin Updated APD location via API.
23. Jun 2016 12:00:06 CEST Tobias Imported from Hamamatsu datasheet.