RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2314025359 - Archived data from Tue, 06. October 2020 16:52:31 CEST


This is all the information about APD 2314025359. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2314025359
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.1 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 231
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1243456 V     T = -25 °C: 344.9048576 V
Voltage for Gain 150: T = +20 °C: 387.9687019 V     T = -25 °C: 352.2952403 V
Voltage for Gain 200: T = +20 °C: 392.3584844 V     T = -25 °C: 356.4562719 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.567003008 V-1     T = -25 °C: 4.945013754 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.981335869 V-1     T = -25 °C: 9.215827719 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.88840985 V-1     T = -25 °C: 16.46050319 V-1
Break-through voltage: T = +20 °C: 407.6980961 V     T = -25 °C: 371.7075782 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:05 CET jreher Updated box and position via API.
29. Jan 2021 10:27:12 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:31 CEST jreher Updated box and position via API.
11. Aug 2020 17:41:08 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:29 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:44 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:54 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:04 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:00 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:10 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:56 CET jreher Updated APD location via API.
25. Nov 2019 17:28:50 CET jreher Updated box and position via API.
22. Oct 2019 13:37:34 CEST spankonin Updated APD location via API.
22. Oct 2019 12:50:40 CEST spankonin Updated APD location via API.
18. Oct 2019 13:58:55 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:59:14 CEST Tobias Imported from Hamamatsu datasheet.