RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0721006959 - Archived data from Wed, 03. February 2021 18:21:14 CET


This is all the information about APD 0721006959. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0721006959
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2701030029/0721006959
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.3 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 57
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 04. Jun 2019
Return for assembly: none
   
Irradiation:  
Date: 29. May 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 29. May 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.5743273 V     T = -25 °C: 348.6325045 V
Voltage for Gain 150: T = +20 °C: 391.5014672 V     T = -25 °C: 356.016129 V
Voltage for Gain 200: T = +20 °C: 395.8857435 V     T = -25 °C: 360.0393196 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.405124194 V-1     T = -25 °C: 4.598808722 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.021302428 V-1     T = -25 °C: 9.165908393 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.20126221 V-1     T = -25 °C: 15.33304683 V-1
Break-through voltage: T = +20 °C: 411.5129917 V     T = -25 °C: 374.914322 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:55:41 CET jreher Updated box and position via API.
03. Feb 2021 18:21:14 CET jreher Updated box and position via API.
11. Aug 2020 17:28:15 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:33 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:09 CET jreher Updated box and position via API.
27. Nov 2019 19:38:47 CET jreher Updated APD location via API.
25. Nov 2019 17:15:23 CET jreher Updated box and position via API.
04. Jul 2019 11:12:57 CEST jreher Updated APD location via API.
03. Jul 2019 18:43:26 CEST jreher Updated APD batch assignment via API.
24. Jun 2019 13:02:34 CEST jgrochowski Updated APD batch assignment via API.
18. Jun 2019 14:19:30 CEST jgrochowski Updated APD batch assignment via API.
04. Jun 2019 15:29:53 CEST markus.moritz
22. Jun 2016 15:13:22 CEST Tobias Imported from Hamamatsu datasheet.