Show Hamamatsu Avalanche Photo Diode 2314025354 - Archived data from Tue, 11. August 2020 17:41:07 CEST
This is all the information about APD 2314025354. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2314025354 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | B12 |
Break-through voltage: | 418 V |
Voltage for Gain 100 (T=+25°C): | 390.9 V |
Dark current: | 3.9 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 231 |
Position in Box: | 29 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 391.76944 V T = -25 °C: 355.4788405 V |
Voltage for Gain 150: | T = +20 °C: 399.6170829 V T = -25 °C: 363.061364 V |
Voltage for Gain 200: | T = +20 °C: 403.9431108 V T = -25 °C: 367.3054281 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.675205136 V-1 T = -25 °C: 4.614189927 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.397957319 V-1 T = -25 °C: 9.181192887 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.76397826 V-1 T = -25 °C: 14.40965936 V-1 |
Break-through voltage: | T = +20 °C: 417.1761462 V T = -25 °C: 381.4098139 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:18:04 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:41:07 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:29:28 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:05:44 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:03:54 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:04 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:57:59 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:10 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:09:55 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:28:50 CET | jreher | Updated box and position via API. |
22. Oct 2019 13:37:33 CEST | spankonin | Updated APD location via API. |
22. Oct 2019 12:50:40 CEST | spankonin | Updated APD location via API. |
18. Oct 2019 13:58:54 CEST | jgrochowski | Updated APD batch assignment via API. |
23. Jun 2016 11:59:13 CEST | Tobias | Imported from Hamamatsu datasheet. |