Show Hamamatsu Avalanche Photo Diode 2314025339 - Archived data from Tue, 22. October 2019 13:37:32 CEST
This is all the information about APD 2314025339. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2314025339 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum Box 231 |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | B03 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 381.4 V |
Dark current: | 4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 231 |
Position in Box: | 14 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:18:03 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:41:04 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:29:27 CEST | jreher | Updated box and position via API. |
31. Mar 2020 08:52:37 CEST | jreher | Assigned to capsule by script |
13. Feb 2020 14:21:53 CET | jreher | Updated box and position via API. |
16. Jan 2020 12:05:42 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:03:53 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:03 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:57:57 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:08 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:09:54 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:28:49 CET | jreher | Updated box and position via API. |
22. Oct 2019 13:37:32 CEST | spankonin | Updated APD location via API. |
22. Oct 2019 12:50:38 CEST | spankonin | Updated APD location via API. |
18. Oct 2019 13:58:53 CEST | jgrochowski | Updated APD batch assignment via API. |
23. Jun 2016 11:59:13 CEST | Tobias | Imported from Hamamatsu datasheet. |