RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2314025328 - Archived data from Fri, 05. February 2021 11:16:12 CET


This is all the information about APD 2314025328. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2314025328
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.5 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 23
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.6667233 V     T = -25 °C: 342.617551 V
Voltage for Gain 150: T = +20 °C: 385.4648425 V     T = -25 °C: 349.9282759 V
Voltage for Gain 200: T = +20 °C: 389.8049076 V     T = -25 °C: 354.0419636 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.418668999 V-1     T = -25 °C: 4.736782615 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.571928489 V-1     T = -25 °C: 9.586728096 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84621738 V-1     T = -25 °C: 15.15962916 V-1
Break-through voltage: T = +20 °C: 405.5620452 V     T = -25 °C: 369.4520568 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:28:04 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:12 CET jreher Updated box and position via API.
11. Aug 2020 17:42:08 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:59 CEST jreher Updated box and position via API.
16. Jan 2020 12:05:42 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:52 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:02 CET jreher Updated irradiation info via API.
16. Jan 2020 11:57:55 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:07 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:13 CET jreher Updated APD location via API.
25. Nov 2019 17:27:45 CET jreher Updated box and position via API.
28. Oct 2019 11:13:09 CET jreher Updated APD location via API.
22. Oct 2019 16:24:33 CEST spankonin Updated APD batch assignment via API.
23. Jun 2016 11:59:12 CEST Tobias Imported from Hamamatsu datasheet.