RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2314025326 - Archived data from Tue, 11. August 2020 17:42:08 CEST


This is all the information about APD 2314025326. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2314025326
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2314025326/2517028885
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 216
Position in Box: 38
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3708093 V     T = -25 °C: 346.0659332 V
Voltage for Gain 150: T = +20 °C: 389.2306139 V     T = -25 °C: 353.4751595 V
Voltage for Gain 200: T = +20 °C: 393.612425 V     T = -25 °C: 357.6438557 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.506457174 V-1     T = -25 °C: 4.920455878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.773228997 V-1     T = -25 °C: 9.038115433 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.32809724 V-1     T = -25 °C: 15.98991001 V-1
Break-through voltage: T = +20 °C: 409.4465214 V     T = -25 °C: 373.3131426 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:16:11 CET jreher Updated box and position via API.
11. Aug 2020 17:42:08 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:59 CEST jreher Updated box and position via API.
03. Apr 2020 10:02:00 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:25 CET jreher Updated box and position via API.
16. Jan 2020 12:05:41 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:52 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:02 CET jreher Updated irradiation info via API.
16. Jan 2020 11:57:55 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:07 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:13 CET jreher Updated APD location via API.
25. Nov 2019 17:27:45 CET jreher Updated box and position via API.
28. Oct 2019 11:13:09 CET jreher Updated APD location via API.
22. Oct 2019 16:24:33 CEST spankonin Updated APD batch assignment via API.
23. Jun 2016 11:59:12 CEST Tobias Imported from Hamamatsu datasheet.