Show Hamamatsu Avalanche Photo Diode 2314025312 - Archived data from Tue, 11. August 2020 17:42:05 CEST
This is all the information about APD 2314025312. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2314025312 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | A09 |
Break-through voltage: | 418 V |
Voltage for Gain 100 (T=+25°C): | 390.3 V |
Dark current: | 3.9 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 23 |
Position in Box: | 41 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 391.0773479 V T = -25 °C: 354.9935051 V |
Voltage for Gain 150: | T = +20 °C: 398.9894238 V T = -25 °C: 362.5886033 V |
Voltage for Gain 200: | T = +20 °C: 403.3846907 V T = -25 °C: 366.8280233 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.503511795 V-1 T = -25 °C: 4.75826394 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.874653252 V-1 T = -25 °C: 9.559884913 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.51217026 V-1 T = -25 °C: 15.02226344 V-1 |
Break-through voltage: | T = +20 °C: 417.2254337 V T = -25 °C: 381.3385139 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
26. Oct 2021 16:06:47 CEST | oafedulidis | Assigned to capsule by script |
17. May 2021 09:16:06 CEST | oafedulidis | Updated box and position via API. |
26. Apr 2021 14:28:03 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:16:10 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:42:05 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:26:57 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:05:40 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:03:51 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:01 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:57:53 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:06 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:07:12 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:27:44 CET | jreher | Updated box and position via API. |
28. Oct 2019 11:13:07 CET | jreher | Updated APD location via API. |
22. Oct 2019 16:22:41 CEST | spankonin | Updated APD batch assignment via API. |
23. Jun 2016 11:59:12 CEST | Tobias | Imported from Hamamatsu datasheet. |