Show Hamamatsu Avalanche Photo Diode 2314025309 - Archived data from Tue, 11. August 2020 17:42:05 CEST
This is all the information about APD 2314025309. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2314025309 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E15 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 384.6 V |
Dark current: | 5.3 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 23 |
Position in Box: | 40 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 383.3291805 V T = -25 °C: 347.7186333 V |
Voltage for Gain 150: | T = +20 °C: 391.2046222 V T = -25 °C: 355.1575974 V |
Voltage for Gain 200: | T = +20 °C: 395.5770217 V T = -25 °C: 359.3323732 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.474495501 V-1 T = -25 °C: 4.945259185 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.691831873 V-1 T = -25 °C: 9.234195627 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.23061859 V-1 T = -25 °C: 14.49413038 V-1 |
Break-through voltage: | T = +20 °C: 409.3291951 V T = -25 °C: 373.1303392 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
26. Apr 2021 14:28:03 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:16:09 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:42:05 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:26:57 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:05:40 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:03:51 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:01 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:57:52 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:57:05 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:07:12 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:27:44 CET | jreher | Updated box and position via API. |
28. Oct 2019 11:13:07 CET | jreher | Updated APD location via API. |
22. Oct 2019 16:22:40 CEST | spankonin | Updated APD batch assignment via API. |
23. Jun 2016 11:59:12 CEST | Tobias | Imported from Hamamatsu datasheet. |