RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2313025280 - Archived data from Tue, 11. August 2020 17:42:01 CEST


This is all the information about APD 2313025280. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2313025280
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2313025280/2206024093
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 216
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6473614 V     T = -25 °C: 346.2388822 V
Voltage for Gain 150: T = +20 °C: 389.5346967 V     T = -25 °C: 353.6480156 V
Voltage for Gain 200: T = +20 °C: 393.9194755 V     T = -25 °C: 357.8026604 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.685844897 V-1     T = -25 °C: 4.798704089 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.298279104 V-1     T = -25 °C: 9.749591353 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.47648184 V-1     T = -25 °C: 15.47331289 V-1
Break-through voltage: T = +20 °C: 409.5075322 V     T = -25 °C: 373.2579826 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:16:07 CET jreher Updated box and position via API.
11. Aug 2020 17:42:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:56 CEST jreher Updated box and position via API.
31. Mar 2020 08:53:49 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:54 CET jreher Updated box and position via API.
16. Jan 2020 12:05:39 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:03:49 CET jreher Updated annealing info via API.
16. Jan 2020 12:00:59 CET jreher Updated irradiation info via API.
16. Jan 2020 11:57:50 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:57:04 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:07:10 CET jreher Updated APD location via API.
25. Nov 2019 17:27:42 CET jreher Updated box and position via API.
28. Oct 2019 11:13:06 CET jreher Updated APD location via API.
22. Oct 2019 16:22:39 CEST spankonin Updated APD batch assignment via API.
23. Jun 2016 11:59:11 CEST Tobias Imported from Hamamatsu datasheet.