RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2313025242 - Archived data from Tue, 11. August 2020 17:46:01 CEST


This is all the information about APD 2313025242. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2313025242
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D03
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.505362 V     T = -25 °C: 350.7139575 V
Voltage for Gain 150: T = +20 °C: 394.3512984 V     T = -25 °C: 358.2141842 V
Voltage for Gain 200: T = +20 °C: 398.713111 V     T = -25 °C: 362.4374624 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.416983874 V-1     T = -25 °C: 4.97978564 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.636707287 V-1     T = -25 °C: 9.11488506 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.02779208 V-1     T = -25 °C: 16.06550433 V-1
Break-through voltage: T = +20 °C: 414.4123284 V     T = -25 °C: 378.2075448 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:29 CET jreher Updated box and position via API.
11. Aug 2020 17:46:01 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:20 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:36 CET jreher Updated APD location via API.
25. Nov 2019 17:27:55 CET jreher Updated box and position via API.
21. Nov 2019 13:28:00 CET spankonin Updated APD location via API.
11. Nov 2019 19:03:39 CET spankonin Updated APD batch assignment via API.
23. Jun 2016 11:59:10 CEST Tobias Imported from Hamamatsu datasheet.