RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2312025150 - Archived data from Tue, 11. August 2020 17:45:32 CEST


This is all the information about APD 2312025150. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2312025150
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 215
Position in Box: 4
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7108621 V     T = -25 °C: 346.394281 V
Voltage for Gain 150: T = +20 °C: 388.6056193 V     T = -25 °C: 353.1850898 V
Voltage for Gain 200: T = +20 °C: 392.9990644 V     T = -25 °C: 357.5202928 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.685468533 V-1     T = -25 °C: 4.45138408 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.268512819 V-1     T = -25 °C: 15.60929671 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44666633 V-1     T = -25 °C: 17.46671901 V-1
Break-through voltage: T = +20 °C: 410.215663 V     T = -25 °C: 372.4372253 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:00 CET jreher Updated box and position via API.
11. Aug 2020 17:45:32 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:46 CEST jreher Updated box and position via API.
27. Nov 2019 20:06:59 CET jreher Updated APD location via API.
25. Nov 2019 17:27:38 CET jreher Updated box and position via API.
11. Nov 2019 18:43:15 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:27:33 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:07 CEST Tobias Imported from Hamamatsu datasheet.