RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2312025105 - Archived data from Wed, 07. October 2020 15:43:58 CEST


This is all the information about APD 2312025105. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2312025105
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D01
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 2
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5792715 V     T = -25 °C: 349.0747313 V
Voltage for Gain 150: T = +20 °C: 392.5402752 V     T = -25 °C: 356.5850561 V
Voltage for Gain 200: T = +20 °C: 396.966137 V     T = -25 °C: 360.7959712 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.364071848 V-1     T = -25 °C: 4.81848755 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.402634395 V-1     T = -25 °C: 9.714896403 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.37415946 V-1     T = -25 °C: 15.42827889 V-1
Break-through voltage: T = +20 °C: 412.5631257 V     T = -25 °C: 376.4068338 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:28 CET jreher Updated box and position via API.
07. Oct 2020 15:43:58 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:53 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:04 CEST jreher Updated box and position via API.
28. Nov 2019 12:50:41 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:15 CET jreher Updated APD location via API.
25. Nov 2019 17:27:16 CET jreher Updated box and position via API.
31. Oct 2019 17:09:40 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:49 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:06 CEST Tobias Imported from Hamamatsu datasheet.