RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2311025095 - Archived data from Tue, 11. August 2020 17:45:41 CEST


This is all the information about APD 2311025095. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2311025095
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2311025095/1913021255
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 215
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7289707 V     T = -25 °C: 345.2761779 V
Voltage for Gain 150: T = +20 °C: 388.5477058 V     T = -25 °C: 352.6873858 V
Voltage for Gain 200: T = +20 °C: 392.8825533 V     T = -25 °C: 356.823158 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.717669845 V-1     T = -25 °C: 4.849885423 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.527431433 V-1     T = -25 °C: 9.861594675 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.78294465 V-1     T = -25 °C: 15.70880757 V-1
Break-through voltage: T = +20 °C: 408.2862587 V     T = -25 °C: 372.0981671 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:16:05 CET jreher Updated box and position via API.
11. Aug 2020 17:45:41 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:50 CEST jreher Updated box and position via API.
03. Apr 2020 10:08:44 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:07 CET jreher Updated box and position via API.
27. Nov 2019 20:07:03 CET jreher Updated APD location via API.
25. Nov 2019 17:27:41 CET jreher Updated box and position via API.
11. Nov 2019 18:48:37 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:27:37 CET spankonin Updated APD location via API.
23. Jun 2016 11:59:06 CEST Tobias Imported from Hamamatsu datasheet.