RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2310024972 - Archived data from Tue, 11. August 2020 17:44:56 CEST


This is all the information about APD 2310024972. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2310024972
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2310024972/2009022117
Unit: #1100 (barcode 1309012350)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 224
Position in Box: 6
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2997315 V     T = -25 °C: 346.1336861 V
Voltage for Gain 150: T = +20 °C: 389.197181 V     T = -25 °C: 353.5810916 V
Voltage for Gain 200: T = +20 °C: 393.6006537 V     T = -25 °C: 357.7542425 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.458837126 V-1     T = -25 °C: 4.820353152 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.707016445 V-1     T = -25 °C: 9.77948652 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.05190452 V-1     T = -25 °C: 15.49345658 V-1
Break-through voltage: T = +20 °C: 407.8712023 V     T = -25 °C: 372.6530564 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:17:12 CET jreher Updated box and position via API.
11. Aug 2020 17:44:56 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:23 CEST jreher Updated box and position via API.
03. Apr 2020 09:47:26 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:19 CET jreher Updated box and position via API.
27. Nov 2019 20:08:40 CET jreher Updated APD location via API.
25. Nov 2019 17:28:20 CET jreher Updated box and position via API.
31. Oct 2019 17:03:38 CET spankonin Updated APD location via API.
31. Oct 2019 16:23:12 CET jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:58:16 CEST Tobias Imported from Hamamatsu datasheet.