RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2308024768 - Archived data from Tue, 11. August 2020 17:46:05 CEST


This is all the information about APD 2308024768. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2308024768
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1433174 V     T = -25 °C: 349.5816736 V
Voltage for Gain 150: T = +20 °C: 392.9603368 V     T = -25 °C: 357.0340621 V
Voltage for Gain 200: T = +20 °C: 397.3052575 V     T = -25 °C: 361.2124104 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.550635738 V-1     T = -25 °C: 4.674840083 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.992895773 V-1     T = -25 °C: 9.328787513 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.02388275 V-1     T = -25 °C: 14.66964797 V-1
Break-through voltage: T = +20 °C: 412.2699476 V     T = -25 °C: 376.2655706 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:27:31 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:20:59 CET jreher Updated box and position via API.
11. Aug 2020 17:46:05 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:13 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:48 CET jreher Updated APD location via API.
25. Nov 2019 17:30:12 CET jreher Updated box and position via API.
11. Nov 2019 18:58:52 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:31:24 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:10 CEST Tobias Imported from Hamamatsu datasheet.