RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2307024703 - Archived data from Tue, 11. August 2020 17:45:50 CEST


This is all the information about APD 2307024703. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2307024703
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380.2 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 217
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.1293635 V     T = -25 °C: 344.8846926 V
Voltage for Gain 150: T = +20 °C: 387.9110864 V     T = -25 °C: 352.1978035 V
Voltage for Gain 200: T = +20 °C: 392.251688 V     T = -25 °C: 356.3100441 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.609354107 V-1     T = -25 °C: 5.002119607 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.134857829 V-1     T = -25 °C: 9.382153622 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16678986 V-1     T = -25 °C: 14.7579949 V-1
Break-through voltage: T = +20 °C: 407.4061125 V     T = -25 °C: 371.416338 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:47 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:49 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:16:20 CET jreher Updated box and position via API.
11. Aug 2020 17:45:50 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:10 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:24 CET jreher Updated APD location via API.
25. Nov 2019 17:27:50 CET jreher Updated box and position via API.
11. Nov 2019 18:55:21 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:28:40 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:08 CEST Tobias Imported from Hamamatsu datasheet.