RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2306024675 - Archived data from Tue, 11. August 2020 17:45:47 CEST


This is all the information about APD 2306024675. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2306024675
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1915021478/2306024675
Unit: #1272 (barcode 1309013432)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 217
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.831632 V     T = -25 °C: 346.0725831 V
Voltage for Gain 150: T = +20 °C: 389.6414345 V     T = -25 °C: 353.4764713 V
Voltage for Gain 200: T = +20 °C: 393.986869 V     T = -25 °C: 357.6147259 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.657509055 V-1     T = -25 °C: 4.899846222 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.188685569 V-1     T = -25 °C: 9.016406849 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.36851756 V-1     T = -25 °C: 16.0094819 V-1
Break-through voltage: T = +20 °C: 409.4415901 V     T = -25 °C: 373.0316563 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:16:18 CET jreher Updated box and position via API.
11. Aug 2020 17:45:47 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:08 CEST jreher Updated box and position via API.
25. Jun 2020 11:26:00 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:33 CET jreher Updated box and position via API.
27. Nov 2019 20:07:23 CET jreher Updated APD location via API.
25. Nov 2019 17:27:49 CET jreher Updated box and position via API.
11. Nov 2019 18:50:21 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:28:38 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:07 CEST Tobias Imported from Hamamatsu datasheet.