RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2306024628 - Archived data from Fri, 05. February 2021 11:21:01 CET


This is all the information about APD 2306024628. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2306024628
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 382.9 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 91
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.6120518 V     T = -25 °C: 347.0532899 V
Voltage for Gain 150: T = +20 °C: 390.5193035 V     T = -25 °C: 354.4966074 V
Voltage for Gain 200: T = +20 °C: 394.9094889 V     T = -25 °C: 358.6663745 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.368507346 V-1     T = -25 °C: 4.889468658 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.455205667 V-1     T = -25 °C: 8.945820596 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59810327 V-1     T = -25 °C: 15.84468129 V-1
Break-through voltage: T = +20 °C: 410.5969214 V     T = -25 °C: 374.1543089 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:27:32 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:21:01 CET jreher Updated box and position via API.
13. Oct 2020 15:56:34 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:33:14 CEST jreher Updated box and position via API.
27. Nov 2019 20:13:50 CET jreher Updated APD location via API.
25. Nov 2019 17:30:14 CET jreher Updated box and position via API.
11. Nov 2019 19:00:10 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:31:26 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:06 CEST Tobias Imported from Hamamatsu datasheet.