RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2306024617 - Archived data from Tue, 11. August 2020 17:43:46 CEST


This is all the information about APD 2306024617. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2306024617
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C02
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.8 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 207
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2089565 V     T = -25 °C: 351.1821586 V
Voltage for Gain 150: T = +20 °C: 395.0768346 V     T = -25 °C: 358.7181405 V
Voltage for Gain 200: T = +20 °C: 399.4623931 V     T = -25 °C: 362.9440484 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.527516524 V-1     T = -25 °C: 4.763473273 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.886608956 V-1     T = -25 °C: 9.554403276 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.53459956 V-1     T = -25 °C: 15.0387099 V-1
Break-through voltage: T = +20 °C: 415.165568 V     T = -25 °C: 378.9121459 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 17:00:57 CEST jreher Updated box and position via API.
05. Feb 2021 11:14:58 CET jreher Updated box and position via API.
11. Aug 2020 17:43:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:41 CET jreher Updated APD location via API.
25. Nov 2019 17:27:07 CET jreher Updated box and position via API.
31. Oct 2019 17:09:20 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:06 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:06 CEST Tobias Imported from Hamamatsu datasheet.