RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2305024527 - Archived data from Tue, 11. August 2020 17:45:26 CEST


This is all the information about APD 2305024527. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2305024527
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.1 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8085902 V     T = -25 °C: 349.2167578 V
Voltage for Gain 150: T = +20 °C: 392.6533244 V     T = -25 °C: 356.6798092 V
Voltage for Gain 200: T = +20 °C: 396.9935639 V     T = -25 °C: 360.8464682 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.692631929 V-1     T = -25 °C: 4.832744597 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.498464576 V-1     T = -25 °C: 9.828283888 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.79836226 V-1     T = -25 °C: 15.6536535 V-1
Break-through voltage: T = +20 °C: 412.3422353 V     T = -25 °C: 376.2024005 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:29 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:15:54 CET jreher Updated box and position via API.
11. Aug 2020 17:45:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:37 CEST jreher Updated box and position via API.
27. Nov 2019 20:06:50 CET jreher Updated APD location via API.
25. Nov 2019 17:27:33 CET jreher Updated box and position via API.
11. Nov 2019 18:42:30 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:26:40 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:04 CEST Tobias Imported from Hamamatsu datasheet.