RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2305024506 - Archived data from Fri, 05. February 2021 11:15:52 CET


This is all the information about APD 2305024506. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2305024506
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.8 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8053479 V     T = -25 °C: 343.9365098 V
Voltage for Gain 150: T = +20 °C: 386.6607098 V     T = -25 °C: 351.3227996 V
Voltage for Gain 200: T = +20 °C: 391.0422837 V     T = -25 °C: 355.4848737 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.691429164 V-1     T = -25 °C: 4.951594951 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.297406668 V-1     T = -25 °C: 9.168041942 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35236728 V-1     T = -25 °C: 16.31160537 V-1
Break-through voltage: T = +20 °C: 402.9490635 V     T = -25 °C: 371.1251618 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:28 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:15:52 CET jreher Updated box and position via API.
11. Aug 2020 17:44:23 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:36 CEST jreher Updated box and position via API.
27. Nov 2019 20:06:48 CET jreher Updated APD location via API.
25. Nov 2019 17:27:31 CET jreher Updated box and position via API.
31. Oct 2019 17:12:48 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 17:01:01 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:03 CEST Tobias Imported from Hamamatsu datasheet.