RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2304024469 - Archived data from Fri, 05. February 2021 11:15:47 CET


This is all the information about APD 2304024469. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2304024469
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F14
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 252
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.1563123 V     T = -25 °C: 346.5507167 V
Voltage for Gain 150: T = +20 °C: 390.0555383 V     T = -25 °C: 354.0140184 V
Voltage for Gain 200: T = +20 °C: 394.4661574 V     T = -25 °C: 358.219811 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.500519488 V-1     T = -25 °C: 4.668463429 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.764635264 V-1     T = -25 °C: 9.254461583 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16230228 V-1     T = -25 °C: 14.44578145 V-1
Break-through voltage: T = +20 °C: 410.488603 V     T = -25 °C: 374.1077535 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:52:58 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:15:47 CET jreher Updated box and position via API.
11. Aug 2020 17:44:18 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:28 CEST jreher Updated box and position via API.
27. Nov 2019 20:06:39 CET jreher Updated APD location via API.
25. Nov 2019 17:27:28 CET jreher Updated box and position via API.
31. Oct 2019 17:11:36 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 17:00:19 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:02 CEST Tobias Imported from Hamamatsu datasheet.