RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2304024445 - Archived data from Tue, 11. August 2020 17:44:14 CEST


This is all the information about APD 2304024445. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2304024445
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2304024445/2001021518
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 213
Position in Box: 9
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3202396 V     T = -25 °C: 346.0560335 V
Voltage for Gain 150: T = +20 °C: 389.114068 V     T = -25 °C: 353.4332683 V
Voltage for Gain 200: T = +20 °C: 393.4657932 V     T = -25 °C: 357.5705351 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.510874796 V-1     T = -25 °C: 4.885738598 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.931738213 V-1     T = -25 °C: 9.100457904 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.68156797 V-1     T = -25 °C: 16.23052342 V-1
Break-through voltage: T = +20 °C: 408.8952509 V     T = -25 °C: 372.9754081 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:45 CET jreher Updated box and position via API.
11. Aug 2020 17:44:14 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:26 CEST jreher Updated box and position via API.
03. Apr 2020 10:01:10 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:12 CET jreher Updated box and position via API.
27. Nov 2019 20:06:38 CET jreher Updated APD location via API.
25. Nov 2019 17:27:26 CET jreher Updated box and position via API.
31. Oct 2019 17:10:51 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 17:00:17 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:02 CEST Tobias Imported from Hamamatsu datasheet.