RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2304024435 - Archived data from Fri, 05. February 2021 11:23:11 CET


This is all the information about APD 2304024435. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2304024435
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 384 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 198
Position in Box: 50
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.4162425 V     T = -25 °C: 348.7045166 V
Voltage for Gain 150: T = +20 °C: 391.2517018 V     T = -25 °C: 356.2389204 V
Voltage for Gain 200: T = +20 °C: 395.5447335 V     T = -25 °C: 360.469356 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.413212024 V-1     T = -25 °C: 5.075134643 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.689865633 V-1     T = -25 °C: 9.279617908 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.57860859 V-1     T = -25 °C: 15.87354922 V-1
Break-through voltage: T = +20 °C: 410.2121436 V     T = -25 °C: 375.5783555 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:31:42 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:23:11 CET jreher Updated box and position via API.
11. Aug 2020 17:46:22 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:15 CEST jreher Updated box and position via API.
27. Nov 2019 20:16:09 CET jreher Updated APD location via API.
25. Nov 2019 17:30:50 CET jreher Updated box and position via API.
14. Nov 2019 17:30:10 CET spankonin Updated APD batch assignment via API.
14. Nov 2019 17:27:02 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:01 CEST Tobias Imported from Hamamatsu datasheet.