RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2304024423 - Archived data from Tue, 11. August 2020 17:46:20 CEST


This is all the information about APD 2304024423. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2304024423
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2516028773/2304024423
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 270
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.7176452 V     T = -25 °C: 347.9129936 V
Voltage for Gain 150: T = +20 °C: 391.5460375 V     T = -25 °C: 355.3274854 V
Voltage for Gain 200: T = +20 °C: 395.8322008 V     T = -25 °C: 359.4889841 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.524428026 V-1     T = -25 °C: 4.916416969 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.543268614 V-1     T = -25 °C: 9.121222814 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.29524877 V-1     T = -25 °C: 16.23950905 V-1
Break-through voltage: T = +20 °C: 410.6987281 V     T = -25 °C: 374.3534555 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:23:10 CET jreher Updated box and position via API.
11. Aug 2020 17:46:20 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:14 CEST jreher Updated box and position via API.
31. Mar 2020 08:52:19 CEST jreher Assigned to capsule by script
13. Feb 2020 13:37:22 CET jreher Updated box and position via API.
27. Nov 2019 20:16:08 CET jreher Updated APD location via API.
25. Nov 2019 17:30:49 CET jreher Updated box and position via API.
14. Nov 2019 17:30:09 CET spankonin Updated APD batch assignment via API.
14. Nov 2019 17:27:01 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:01 CEST Tobias Imported from Hamamatsu datasheet.