RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2303024397 - Archived data from Fri, 05. February 2021 11:23:07 CET


This is all the information about APD 2303024397. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2303024397
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 198
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.2014622 V     T = -25 °C: 343.2695882 V
Voltage for Gain 150: T = +20 °C: 385.965749 V     T = -25 °C: 350.5498274 V
Voltage for Gain 200: T = +20 °C: 390.3128745 V     T = -25 °C: 354.6171443 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.586208554 V-1     T = -25 °C: 4.889170287 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.028438149 V-1     T = -25 °C: 10.05980567 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.95165012 V-1     T = -25 °C: 16.19458789 V-1
Break-through voltage: T = +20 °C: 406.158129 V     T = -25 °C: 369.9998957 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:31:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:23:07 CET jreher Updated box and position via API.
11. Aug 2020 17:46:16 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:36:12 CEST jreher Updated box and position via API.
27. Nov 2019 20:16:06 CET jreher Updated APD location via API.
25. Nov 2019 17:30:47 CET jreher Updated box and position via API.
14. Nov 2019 17:29:50 CET spankonin Updated APD batch assignment via API.
14. Nov 2019 17:24:32 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:00 CEST Tobias Imported from Hamamatsu datasheet.