RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2303024388 - Archived data from Fri, 29. January 2021 10:25:29 CET


This is all the information about APD 2303024388. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2303024388
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2705030362/2303024388
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 217
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.184357 V     T = -25 °C: 346.5813099 V
Voltage for Gain 150: T = +20 °C: 390.041286 V     T = -25 °C: 354.0343209 V
Voltage for Gain 200: T = +20 °C: 394.4301564 V     T = -25 °C: 358.2139143 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.576946625 V-1     T = -25 °C: 4.675453775 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.921854075 V-1     T = -25 °C: 9.392419575 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.61797345 V-1     T = -25 °C: 14.82054223 V-1
Break-through voltage: T = +20 °C: 409.3389842 V     T = -25 °C: 373.22895 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:16:17 CET jreher Updated box and position via API.
29. Jan 2021 10:25:29 CET jreher Assigned to capsule by script
06. Oct 2020 16:50:48 CEST jreher Updated box and position via API.
11. Aug 2020 17:45:45 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:27:08 CEST jreher Updated box and position via API.
27. Nov 2019 20:07:22 CET jreher Updated APD location via API.
25. Nov 2019 17:27:48 CET jreher Updated box and position via API.
11. Nov 2019 18:50:20 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:28:37 CET spankonin Updated APD location via API.
23. Jun 2016 11:58:00 CEST Tobias Imported from Hamamatsu datasheet.