RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2303024360 - Archived data from Tue, 11. August 2020 17:45:28 CEST


This is all the information about APD 2303024360. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2303024360
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.2 V
Dark current: 5.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 214
Position in Box: 21
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.2247582 V     T = -25 °C: 352.2640336 V
Voltage for Gain 150: T = +20 °C: 396.1085441 V     T = -25 °C: 359.7943954 V
Voltage for Gain 200: T = +20 °C: 400.4933218 V     T = -25 °C: 364.0021523 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.51098214 V-1     T = -25 °C: 4.719221274 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.872265356 V-1     T = -25 °C: 9.531504098 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.56325363 V-1     T = -25 °C: 15.04154529 V-1
Break-through voltage: T = +20 °C: 414.7689346 V     T = -25 °C: 378.6165704 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:29:30 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:15:56 CET jreher Updated box and position via API.
11. Aug 2020 17:45:28 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:38 CEST jreher Updated box and position via API.
27. Nov 2019 20:06:51 CET jreher Updated APD location via API.
25. Nov 2019 17:27:35 CET jreher Updated box and position via API.
11. Nov 2019 18:42:31 CET spankonin Updated APD batch assignment via API.
11. Nov 2019 18:26:41 CET spankonin Updated APD location via API.
23. Jun 2016 11:57:59 CEST Tobias Imported from Hamamatsu datasheet.