RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2302024261 - Archived data from Thu, 03. September 2020 14:25:35 CEST


This is all the information about APD 2302024261. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2302024261
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2311025048/2302024261
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386 V
Dark current: 3.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 205
Position in Box: 18
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7395781 V     T = -25 °C: 349.9031755 V
Voltage for Gain 150: T = +20 °C: 393.5902489 V     T = -25 °C: 357.363007 V
Voltage for Gain 200: T = +20 °C: 397.9404142 V     T = -25 °C: 361.5400112 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.674897345 V-1     T = -25 °C: 4.863530223 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.309015191 V-1     T = -25 °C: 8.995900067 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.58338179 V-1     T = -25 °C: 15.88412557 V-1
Break-through voltage: T = +20 °C: 413.4529727 V     T = -25 °C: 377.1975382 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:43 CET jreher Updated box and position via API.
03. Sep 2020 14:25:35 CEST jreher Assigned to capsule by script
11. Aug 2020 17:43:32 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:23:31 CET jreher Updated box and position via API.
27. Nov 2019 20:05:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:57 CET jreher Updated box and position via API.
31. Oct 2019 17:07:45 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:55:06 CET spankonin Updated APD location via API.
23. Jun 2016 11:57:56 CEST Tobias Imported from Hamamatsu datasheet.