Serial: 2206024105
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 205
Position in Box: 14
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6921639 V     T = -25 °C: 350.9358133 V
Voltage for Gain 150: T = +20 °C: 394.6201788 V     T = -25 °C: 358.4718154 V
Voltage for Gain 200: T = +20 °C: 399.0290663 V     T = -25 °C: 362.7003791 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.661273191 V-1     T = -25 °C: 4.861037195 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.188307054 V-1     T = -25 °C: 8.845091809 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.21611033 V-1     T = -25 °C: 15.47403351 V-1
Break-through voltage: T = +20 °C: 413.7016727 V     T = -25 °C: 377.8423411 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:43 CET jreher Updated box and position via API.
07. Oct 2020 15:43:56 CEST jreher Updated APD location via API.
11. Aug 2020 17:43:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:05:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:57 CET jreher Updated box and position via API.
31. Oct 2019 17:07:44 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:55:06 CET spankonin Updated APD location via API.
23. Jun 2016 11:56:56 CEST Tobias Imported from Hamamatsu datasheet.