RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2206024103 - Archived data from Tue, 11. August 2020 17:43:31 CEST


This is all the information about APD 2206024103. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2206024103
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025920/2206024103
Unit: #920 (barcode 1309009893)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 205
Position in Box: 12
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5574558 V     T = -25 °C: 345.1988336 V
Voltage for Gain 150: T = +20 °C: 388.4097603 V     T = -25 °C: 352.5989378 V
Voltage for Gain 200: T = +20 °C: 392.7813126 V     T = -25 °C: 356.7475538 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.380743122 V-1     T = -25 °C: 4.793261955 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.324880299 V-1     T = -25 °C: 9.733949961 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.55905847 V-1     T = -25 °C: 15.39893599 V-1
Break-through voltage: T = +20 °C: 408.6237456 V     T = -25 °C: 372.3766246 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:42 CET jreher Updated box and position via API.
11. Aug 2020 17:43:31 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:52:22 CEST jreher Assigned to capsule by script
13. Feb 2020 13:37:21 CET jreher Updated box and position via API.
27. Nov 2019 20:05:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:56 CET jreher Updated box and position via API.
31. Oct 2019 17:07:44 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:55:06 CET spankonin Updated APD location via API.
23. Jun 2016 11:56:56 CEST Tobias Imported from Hamamatsu datasheet.