RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2206024098 - Archived data from Tue, 11. August 2020 17:43:30 CEST


This is all the information about APD 2206024098. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2206024098
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2206024098/2420027503
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 205
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8141167 V     T = -25 °C: 346.3721377 V
Voltage for Gain 150: T = +20 °C: 389.7057859 V     T = -25 °C: 353.763335 V
Voltage for Gain 200: T = +20 °C: 394.0942169 V     T = -25 °C: 357.9027528 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.666739307 V-1     T = -25 °C: 4.801635096 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.182901582 V-1     T = -25 °C: 9.753473249 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26129942 V-1     T = -25 °C: 15.49533137 V-1
Break-through voltage: T = +20 °C: 410.0554682 V     T = -25 °C: 373.5685001 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:42 CET jreher Updated box and position via API.
11. Aug 2020 17:43:30 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:01 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:00 CET jreher Updated box and position via API.
27. Nov 2019 20:05:19 CET jreher Updated APD location via API.
25. Nov 2019 17:26:56 CET jreher Updated box and position via API.
31. Oct 2019 17:07:44 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:55:05 CET spankonin Updated APD location via API.
23. Jun 2016 11:56:56 CEST Tobias Imported from Hamamatsu datasheet.