RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2010022238 - Archived data from Tue, 11. August 2020 17:41:41 CEST


This is all the information about APD 2010022238. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2010022238
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.3 V
Dark current: 23.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 225
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 375.6739455 V     T = -25 °C: 341.6352163 V
Voltage for Gain 150: T = +20 °C: 383.2665316 V     T = -25 °C: 348.7206123 V
Voltage for Gain 200: T = +20 °C: 387.5195014 V     T = -25 °C: 352.6933598 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.88572421 V-1     T = -25 °C: 5.270227314 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.883899091 V-1     T = -25 °C: 10.07325347 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.52523513 V-1     T = -25 °C: 16.21154655 V-1
Break-through voltage: T = +20 °C: 403.085299 V     T = -25 °C: 367.6581483 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:17:21 CET jreher Updated box and position via API.
11. Aug 2020 17:41:41 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:28:34 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:40 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:51 CET jreher Updated annealing info via API.
16. Jan 2020 12:02:01 CET jreher Updated irradiation info via API.
16. Jan 2020 11:59:09 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:26 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:08:52 CET jreher Updated APD location via API.
25. Nov 2019 17:28:25 CET jreher Updated box and position via API.
22. Oct 2019 12:57:27 CEST spankonin Updated APD location via API.
18. Oct 2019 14:10:17 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:53:51 CEST Tobias Imported from Hamamatsu datasheet.