RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2010022201 - Archived data from Tue, 11. August 2020 17:41:36 CEST


This is all the information about APD 2010022201. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2010022201
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C07
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.8 V
Dark current: 23 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 232
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.8674957 V     T = -25 °C: 340.9672028 V
Voltage for Gain 150: T = +20 °C: 382.4372977 V     T = -25 °C: 348.0556274 V
Voltage for Gain 200: T = +20 °C: 386.6927234 V     T = -25 °C: 352.0344703 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.829727642 V-1     T = -25 °C: 5.129195562 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.783596585 V-1     T = -25 °C: 9.817777272 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.29804167 V-1     T = -25 °C: 15.68827734 V-1
Break-through voltage: T = +20 °C: 402.0522724 V     T = -25 °C: 366.7659458 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:13 CET jreher Updated box and position via API.
11. Aug 2020 17:41:36 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:39 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:38 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:49 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:58 CET jreher Updated irradiation info via API.
16. Jan 2020 11:59:07 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:22 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:07 CET jreher Updated APD location via API.
25. Nov 2019 17:28:55 CET jreher Updated box and position via API.
22. Oct 2019 12:56:48 CEST spankonin Updated APD location via API.
18. Oct 2019 14:07:58 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:53:50 CEST Tobias Imported from Hamamatsu datasheet.