RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2008022091 - Archived data from Thu, 16. January 2020 12:04:44 CET


This is all the information about APD 2008022091. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2008022091
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.8 V
Dark current: 18.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 234
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:26:39 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:16:21 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:18:28 CET jreher Updated box and position via API.
11. Aug 2020 17:41:26 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:59 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:34 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:44 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:54 CET jreher Updated irradiation info via API.
16. Jan 2020 11:59:02 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:14 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:10:29 CET jreher Updated APD location via API.
25. Nov 2019 17:29:04 CET jreher Updated box and position via API.
22. Oct 2019 12:56:10 CEST spankonin Updated APD location via API.
18. Oct 2019 14:06:38 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:53:47 CEST Tobias Imported from Hamamatsu datasheet.