Show Hamamatsu Avalanche Photo Diode 2008022080 - Archived data from Tue, 11. August 2020 17:43:19 CEST
This is all the information about APD 2008022080. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2008022080 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E08 |
Break-through voltage: | 405 V |
Voltage for Gain 100 (T=+25°C): | 376.1 V |
Dark current: | 9.7 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 204 |
Position in Box: | 48 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 376.3776532 V T = -25 °C: 342.0273258 V |
Voltage for Gain 150: | T = +20 °C: 384.1101753 V T = -25 °C: 349.2219559 V |
Voltage for Gain 200: | T = +20 °C: 388.4543816 V T = -25 °C: 353.2728396 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.555465452 V-1 T = -25 °C: 5.06507537 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.972566496 V-1 T = -25 °C: 9.51100203 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.62725864 V-1 T = -25 °C: 15.03071544 V-1 |
Break-through voltage: | T = +20 °C: 403.912154 V T = -25 °C: 368.1981722 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
16. Nov 2021 09:31:56 CET | oafedulidis | Assigned to capsule by script |
17. May 2021 09:15:15 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:14:38 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:43:19 CEST | jreher | Updated APD characteristics via API. |
16. Jan 2020 12:06:33 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:44 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:54 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:59:01 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:58:13 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:05:11 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:26:54 CET | jreher | Updated box and position via API. |
22. Oct 2019 16:37:35 CEST | spankonin | Updated APD batch assignment via API. |
22. Oct 2019 16:17:52 CEST | spankonin | Updated APD location via API. |
23. Jun 2016 11:53:47 CEST | Tobias | Imported from Hamamatsu datasheet. |