RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2008022080 - Archived data from Tue, 11. August 2020 17:43:19 CEST


This is all the information about APD 2008022080. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2008022080
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.1 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 204
Position in Box: 48
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.3776532 V     T = -25 °C: 342.0273258 V
Voltage for Gain 150: T = +20 °C: 384.1101753 V     T = -25 °C: 349.2219559 V
Voltage for Gain 200: T = +20 °C: 388.4543816 V     T = -25 °C: 353.2728396 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.555465452 V-1     T = -25 °C: 5.06507537 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.972566496 V-1     T = -25 °C: 9.51100203 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.62725864 V-1     T = -25 °C: 15.03071544 V-1
Break-through voltage: T = +20 °C: 403.912154 V     T = -25 °C: 368.1981722 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:31:56 CET oafedulidis Assigned to capsule by script
17. May 2021 09:15:15 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:14:38 CET jreher Updated box and position via API.
11. Aug 2020 17:43:19 CEST jreher Updated APD characteristics via API.
16. Jan 2020 12:06:33 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:44 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:54 CET jreher Updated irradiation info via API.
16. Jan 2020 11:59:01 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:13 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:05:11 CET jreher Updated APD location via API.
25. Nov 2019 17:26:54 CET jreher Updated box and position via API.
22. Oct 2019 16:37:35 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:52 CEST spankonin Updated APD location via API.
23. Jun 2016 11:53:47 CEST Tobias Imported from Hamamatsu datasheet.