RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2008022059 - Archived data from Fri, 18. December 2020 14:01:20 CET


This is all the information about APD 2008022059. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2008022059
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.3 V
Dark current: 17.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 204
Position in Box: 43
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.0912017 V     T = -25 °C: 343.6180667 V
Voltage for Gain 150: T = +20 °C: 385.85766 V     T = -25 °C: 350.8611454 V
Voltage for Gain 200: T = +20 °C: 390.2063775 V     T = -25 °C: 354.9260294 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.67895741 V-1     T = -25 °C: 4.821202612 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.223857262 V-1     T = -25 °C: 9.93691691 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.44941096 V-1     T = -25 °C: 15.9714989 V-1
Break-through voltage: T = +20 °C: 405.225323 V     T = -25 °C: 369.5156674 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 18:45:27 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:14:38 CET jreher Updated box and position via API.
18. Dec 2020 14:01:20 CET jreher Updated box and position via API.
11. Aug 2020 17:43:18 CEST jreher Updated APD characteristics via API.
16. Jan 2020 12:06:31 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:42 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:52 CET jreher Updated irradiation info via API.
16. Jan 2020 11:59:00 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:10 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:05:10 CET jreher Updated APD location via API.
25. Nov 2019 17:26:54 CET jreher Updated box and position via API.
22. Oct 2019 16:37:34 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:51 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:51 CEST Tobias Imported from Hamamatsu datasheet.