RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2008022052 - Archived data from Tue, 11. August 2020 17:43:16 CEST


This is all the information about APD 2008022052. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2008022052
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.8 V
Dark current: 14 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 204
Position in Box: 36
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7138282 V     T = -25 °C: 342.9490406 V
Voltage for Gain 150: T = +20 °C: 384.6031411 V     T = -25 °C: 350.1124033 V
Voltage for Gain 200: T = +20 °C: 388.993879 V     T = -25 °C: 354.1319639 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.684676314 V-1     T = -25 °C: 5.134884332 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.255679665 V-1     T = -25 °C: 9.664296071 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.30514462 V-1     T = -25 °C: 15.36631368 V-1
Break-through voltage: T = +20 °C: 404.9389657 V     T = -25 °C: 369.266632 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:37 CET jreher Updated box and position via API.
11. Aug 2020 17:43:16 CEST jreher Updated APD characteristics via API.
16. Jan 2020 12:06:31 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:41 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:52 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:59 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:09 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:05:10 CET jreher Updated APD location via API.
25. Nov 2019 17:26:54 CET jreher Updated box and position via API.
22. Oct 2019 16:37:18 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:51 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:51 CEST Tobias Imported from Hamamatsu datasheet.