RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2008022034 - Archived data from Tue, 11. August 2020 17:43:12 CEST


This is all the information about APD 2008022034. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2008022034
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 401 V
Voltage for Gain 100 (T=+25°C): 374.4 V
Dark current: 11.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 204
Position in Box: 13
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.0740173 V     T = -25 °C: 339.8776956 V
Voltage for Gain 150: T = +20 °C: 381.6987604 V     T = -25 °C: 346.9697529 V
Voltage for Gain 200: T = +20 °C: 385.9619509 V     T = -25 °C: 350.9505972 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.713268181 V-1     T = -25 °C: 5.172337771 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.445667595 V-1     T = -25 °C: 9.896984802 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.88919966 V-1     T = -25 °C: 15.97248717 V-1
Break-through voltage: T = +20 °C: 400.7739479 V     T = -25 °C: 365.2284993 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:14:34 CET jreher Updated box and position via API.
11. Aug 2020 17:43:12 CEST jreher Updated APD characteristics via API.
16. Jan 2020 12:06:30 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:40 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:50 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:58 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:06 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:05:08 CET jreher Updated APD location via API.
25. Nov 2019 17:26:51 CET jreher Updated box and position via API.
22. Oct 2019 16:37:17 CEST spankonin Updated APD batch assignment via API.
22. Oct 2019 16:17:49 CEST spankonin Updated APD location via API.
23. Jun 2016 11:52:50 CEST Tobias Imported from Hamamatsu datasheet.