RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2008022019 - Archived data from Thu, 16. January 2020 12:06:28 CET


This is all the information about APD 2008022019. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2008022019
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 402 V
Voltage for Gain 100 (T=+25°C): 374.1 V
Dark current: 14.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 231
Position in Box: 3
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Aug 2019
Sent for analysis after irradiation: 15. Oct 2019
Return for assembly: none
   
Irradiation:  
Date: 09. Oct 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 12. Oct 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:18:01 CET jreher Updated box and position via API.
11. Aug 2020 17:41:02 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:29:26 CEST jreher Updated box and position via API.
16. Jan 2020 12:06:28 CET jreher Updated date sent for analysis after screening via API.
16. Jan 2020 12:04:39 CET jreher Updated annealing info via API.
16. Jan 2020 12:01:49 CET jreher Updated irradiation info via API.
16. Jan 2020 11:58:57 CET jreher Updated arrival for irradiation via API.
16. Jan 2020 11:58:04 CET jreher Updated arrival for irradiation via API.
27. Nov 2019 20:09:53 CET jreher Updated APD location via API.
25. Nov 2019 17:28:48 CET jreher Updated box and position via API.
22. Oct 2019 13:37:31 CEST spankonin Updated APD location via API.
22. Oct 2019 12:50:37 CEST spankonin Updated APD location via API.
18. Oct 2019 13:57:52 CEST jgrochowski Updated APD batch assignment via API.
23. Jun 2016 11:52:50 CEST Tobias Imported from Hamamatsu datasheet.