Show Hamamatsu Avalanche Photo Diode 2007021997 - Archived data from Tue, 11. August 2020 17:40:59 CEST
This is all the information about APD 2007021997. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2007021997 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C13 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 381.2 V |
Dark current: | 16.8 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 235 |
Position in Box: | 38 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 381.6603056 V T = -25 °C: 346.7761618 V |
Voltage for Gain 150: | T = +20 °C: 389.4575142 V T = -25 °C: 354.0497383 V |
Voltage for Gain 200: | T = +20 °C: 393.79577 V T = -25 °C: 358.1475357 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.423384922 V-1 T = -25 °C: 5.086419392 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.581285725 V-1 T = -25 °C: 9.531293457 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.82876748 V-1 T = -25 °C: 15.03258802 V-1 |
Break-through voltage: | T = +20 °C: 409.3510378 V T = -25 °C: 373.2871244 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
09. Feb 2021 11:21:39 CET | jreher | Assigned to capsule by script |
05. Feb 2021 11:18:37 CET | jreher | Updated box and position via API. |
18. Dec 2020 13:59:41 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:40:59 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:30:11 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:06:27 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:38 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:48 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:56 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:58:02 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:10:40 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:29:10 CET | jreher | Updated box and position via API. |
22. Oct 2019 12:49:12 CEST | spankonin | Updated APD location via API. |
18. Oct 2019 13:57:50 CEST | jgrochowski | Updated APD batch assignment via API. |
23. Jun 2016 11:52:49 CEST | Tobias | Imported from Hamamatsu datasheet. |