Show Hamamatsu Avalanche Photo Diode 2007021978 - Archived data from Tue, 11. August 2020 17:40:56 CEST
This is all the information about APD 2007021978. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2007021978 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | A08 |
Break-through voltage: | 404 V |
Voltage for Gain 100 (T=+25°C): | 376.7 V |
Dark current: | 17.9 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 235 |
Position in Box: | 25 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 21. Aug 2019 |
Sent for analysis after irradiation: | 15. Oct 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 09. Oct 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 12. Oct 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 378.1449013 V T = -25 °C: 343.9000717 V |
Voltage for Gain 150: | T = +20 °C: 385.9144274 V T = -25 °C: 351.1226894 V |
Voltage for Gain 200: | T = +20 °C: 390.2682875 V T = -25 °C: 355.1828278 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.649473354 V-1 T = -25 °C: 5.083657792 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.10917936 V-1 T = -25 °C: 9.546530571 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.10306591 V-1 T = -25 °C: 15.22398778 V-1 |
Break-through voltage: | T = +20 °C: 404.0594995 V T = -25 °C: 368.6869479 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:18:35 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:40:56 CEST | jreher | Updated APD characteristics via API. |
21. Jul 2020 14:30:09 CEST | jreher | Updated box and position via API. |
16. Jan 2020 12:06:26 CET | jreher | Updated date sent for analysis after screening via API. |
16. Jan 2020 12:04:37 CET | jreher | Updated annealing info via API. |
16. Jan 2020 12:01:47 CET | jreher | Updated irradiation info via API. |
16. Jan 2020 11:58:54 CET | jreher | Updated arrival for irradiation via API. |
16. Jan 2020 11:58:00 CET | jreher | Updated arrival for irradiation via API. |
27. Nov 2019 20:10:39 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:29:09 CET | jreher | Updated box and position via API. |
22. Oct 2019 12:49:10 CEST | spankonin | Updated APD location via API. |
18. Oct 2019 13:56:20 CEST | jgrochowski | Updated APD batch assignment via API. |
23. Jun 2016 11:52:49 CEST | Tobias | Imported from Hamamatsu datasheet. |