RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0718006753 - Archived data from Wed, 07. October 2020 12:17:12 CEST


This is all the information about APD 0718006753. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0718006753
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 0718006753/2508028165
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 31.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 198
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.0198194 V     T = -25 °C: 345.7157364 V
Voltage for Gain 150: T = +20 °C: 388.8839294 V     T = -25 °C: 353.0453053 V
Voltage for Gain 200: T = +20 °C: 393.2650849 V     T = -25 °C: 357.1761838 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.544224423 V-1     T = -25 °C: 4.978944521 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.841706768 V-1     T = -25 °C: 9.257163224 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.27572693 V-1     T = -25 °C: 16.43214656 V-1
Break-through voltage: T = +20 °C: 408.365944 V     T = -25 °C: 372.0663646 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:13:54 CET jreher Updated box and position via API.
07. Oct 2020 12:17:12 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:32 CEST jreher Updated box and position via API.
11. Aug 2020 17:36:01 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:04:07 CET jreher Updated APD location via API.
25. Nov 2019 17:26:28 CET jreher Updated box and position via API.
13. Aug 2019 14:44:26 CEST spankonin Updated APD batch assignment via API.
22. Jun 2016 15:13:18 CEST Tobias Imported from Hamamatsu datasheet.